Skip to page content

Wireless monitoring for buildings & excavation

Keep excavation readings within reach.

Ackcio Beam connects suitable instruments to a wireless acquisition network, so your team can access readings remotely as excavation and construction stages change.

  • Instrument-matched acquisition
  • Self-Healing Mesh
  • Remote access and configuration
Excavation and strut installation at the Neste refinery project in Singapore
Neste refinery, Singapore · Explore the deployment

Published deployments

Wireless acquisition in active construction

From strut instrumentation to retaining-wall deformation, these projects show how Ackcio connects instruments to remote readings.

Neste refinery monitoring installation

Singapore · STRUT MONITORING

Neste refinery

Kimaro, supported by CEP, installed Ackcio Beam to acquire readings from strain gauges on excavation struts. The published case describes 80 gauges connected to ten BEAM-VW-S8 nodes, with hourly readings.

A practical example of distributed acquisition around an active refinery excavation. Sensor-to-node cables remain part of the installation.

Read the Neste refinery case study
View installation photographs
Bispevika, central Oslo monitoring installation

Norway · SHEET PILE WALL DEFORMATION

Bispevika, central Oslo

Cautus Geo connected four 16 m Measurand SAAV automatic inclinometers to Ackcio Digital Nodes and a gateway. Readings supported review of sheet pile wall deformation as excavation and bracing progressed.

Measurand SAAV is a third-party instrument. Wireless communication reduced the need for long data-logger cable runs along the sheet pile wall.

Read the Bispevika, central Oslo case study
View installation photographs
Bedok Canal monitoring installation

Singapore · CANAL SUPPORT LOADS

Bedok Canal

For the canal expansion, Ackcio Beam collected readings from 14 vibrating wire strain gauges and six vibrating wire load cells on steel I-beams. Six VW-S8 nodes and one gateway supported the installation.

The published case reports 15-minute readings as the works required more frequent monitoring than manual rounds could provide.

Read the Bedok Canal case study
Great World MRT station monitoring installation

Singapore · 2019 URBAN TEST DEPLOYMENT

Great World MRT station

A February–April 2019 test deployment monitored piezometers, strain gauges, load cells and tiltmeters around the station construction site. Different Ackcio node types served the instruments’ respective outputs.

The case documents above- and below-ground instruments in a congested urban setting. Its test results are specific to that configuration and period.

Read the Great World MRT station case study
View installation photographs
Alexandra Emhjellen, Cautus Geo
“The monitoring has shown to be incredibly stable.”Alexandra Emhjellen, Geologist, Cautus Geo · Bispevika case study

From measurement to review

How Ackcio fits your monitoring setup

The instrument output, reading interval, site layout and data destination determine the system configuration.

Ackcio Gateway assembly02 / GATEWAY

Collect the readings

The gateway receives data from the Beam network. Plan its location, power and backhaul around the excavation and the required workflow.

Explore the Gateway
Ackcio software screens03 / SOFTWARE

Review and integrate

Manage the network and sensor data through Snape. Send readings to compatible third-party platforms or your own software using supported API or FTP integrations. Confirm the data format, destination and access requirements for your project.

Explore Snape

Work with the instruments you use

Select the node by the instrument’s electrical output: analogue, vibrating wire or a supported digital interface. The instrument category alone does not determine compatibility.

Check output type, excitation, power, channel requirements and reading interval for each model. Ackcio sensors and compatible third-party instruments can form part of the same monitoring plan.

Fit your existing data workflow

Choose where engineers will review the readings: Snape, a compatible monitoring platform or an internal system. Plan the gateway connection and integration around that destination.

Confirm supported interfaces and data formats with the project team before specifying the system.

The wireless differentiator

Self-Healing Mesh

Excavation geometry and site conditions can affect radio links. Ackcio Beam automatically selects communication paths, using alternative routes where available.

Self-Healing Mesh uses alternative radio paths where available. It does not repair cut sensor cables, failed instruments or power loss. Local sensor wiring still needs protection as the excavation changes.

How Ackcio Mesh works
Open-pit example showing a blocked red radio link and alternative green routes between sensor nodes and the gateway.
Open-pit example: the red link is blocked; green links show alternative radio paths. Available routes depend on network design and site conditions.

Beam Mesh and TM-L LoRa are different communication systems. Specify their respective gateway and network arrangements; do not assume a TM-L device relays Beam Mesh traffic.

Six monitoring areas

A connected view of the excavation

Select the measurements that answer your project’s engineering questions. Each area combines the instrument, acquisition method and review context.

Excavation monitoring illustration: Neighbouring buildings
01 / Neighbouring buildings

Monitoring area 01

Neighbouring buildings

Are neighbouring buildings and roads changing as excavation progresses?

Follow building response alongside nearby excavation activity. Choose separate instruments for angular change, crack movement and settlement.

Building tilt
Tiltmeters record angular change in façades, columns or walls.
Crack opening and closing
Crackmeters track movement across an existing crack or joint.
Road settlement and vibration
Use suitable settlement instruments or survey methods for vertical movement. Piling vibration needs a dedicated acquisition specification.

Relevant Ackcio products

Mesh TiltmeterCrackmeter
Measurement considerations

Tilt is not a direct settlement measurement. Confirm vibration frequency range, sample rate, triggering, synchronisation and data transfer before specifying a vibration sensor or integration.

Excavation monitoring illustration: Retaining wall deflection
02 / Retaining wall deflection

Monitoring area 02

Retaining wall deflection

How is the wall moving with depth at each excavation stage?

Review wall deformation together with excavation depth, support installation and ground movement behind the wall.

Deflection profile
Use a suitable GeoArray or supported in-place inclinometer installation to assess movement with depth.
Movement behind the wall
Select appropriate extensometers, settlement instruments or surveys for the required displacement component.
Stage-by-stage comparison
Keep a baseline and compare readings before and after excavation, strut installation and support removal.
Measurement considerations

In-place inclinometers and extensometers may be third-party instruments. Confirm model, output, orientation, reference conditions and installation geometry. A surface tiltmeter measures angle; it does not directly provide a wall deflection profile.

Excavation monitoring illustration: Groundwater and dewatering
03 / Groundwater and dewatering

Monitoring area 03

Groundwater and dewatering

How are pore pressure and water levels changing around the excavation?

Bring groundwater readings into the same review routine as pumping changes and construction activity.

Pore-water pressure
VW piezometers monitor pressure at selected depths outside and beneath the excavation.
Dewatering well levels
Suitable water-level instruments track changes in wells and standpipes.
Drawdown and discharge
Compare groundwater trends near neighbouring buildings; add compatible flow measurement where pumping discharge is part of the plan.
Measurement considerations

Water-level and flow instruments are supported third-party categories where their output is compatible. Confirm calibration, pressure reference, elevation datum, power and reading interval. Pressure or water-level readings alone do not measure building settlement.

Excavation monitoring illustration: Struts and anchors
04 / Struts and anchors

Monitoring area 04

Struts and anchors

How are support loads changing as excavation advances?

Review measured load and strain against the project engineer’s design assumptions and response criteria.

Struts and walers
Strain gauges record local strain in selected support members.
Ground anchors
Suitable load cells measure force at instrumented anchor heads.
Stage and temperature effects
Compare changes as levels are excavated, supports are installed or removed, and temperature varies.
Measurement considerations

Converting strain to stress or member force requires material properties, section geometry, temperature treatment and engineering assumptions. Check load-cell seating and capacity. Monitoring does not establish a safe load or guarantee structural performance.

Excavation monitoring illustration: Building structure
05 / Building structure

Monitoring area 05

Building structure

How is the structure responding as the building rises?

Keep readings from selected structural elements accessible through changes in loading and construction sequence.

Columns and core walls
Tiltmeters measure angular change at their mounting locations.
Transfer beams and columns
Strain gauges track local response to changing construction loads.
Slabs, walls and connections
Crackmeters track opening and closing; load cells can be specified where a suitable installation is designed.
Measurement considerations

Define baselines, gauge orientation, thermal effects and load stages with the structural engineer. Review these readings alongside inspections and other required surveys; do not infer overall structural condition from a single sensor.

Excavation monitoring illustration: Data health
06 / Data health

Monitoring area 06

Data health

Does a changing reading need engineering review, a field check, or both?

Check the measurement record and the acquisition network together before interpreting a sudden change.

Missing readings and radio paths
Review gaps, available link status and changes in site obstructions.
Instrument and power checks
Check available battery and temperature status, connectors and sensor cables when readings are absent or unusual.
Spikes and noise
Compare neighbouring measurements and site activity, including welding or generators, and investigate the instrument installation.

Relevant Ackcio products

SnapeAckcio MeshGateway
Measurement considerations

Available status fields depend on hardware and software configuration. A gap or spike is a reason to investigate, not automatic proof of sensor failure. Mesh may reroute radio traffic where an alternative path exists; it cannot repair wiring, an instrument or its power supply.

Close gaps in the monitoring record

Keep acquisition aligned with the work

Wireless data collection complements inspections and engineering judgement. Its value depends on the measurement plan and the team’s response process.

Between site rounds

Scheduled acquisition adds readings between manual visits. Set the interval to the monitoring objective rather than assuming every application needs the same frequency.

Across changing work areas

Place nodes close to instruments where practical, and protect the remaining sensor cables from plant movements and temporary works.

From reading to response

Assign data review and escalation responsibilities. A recorded threshold exceedance still needs an agreed engineering response.

When communication changes

Recheck radio paths, node locations and backhaul as steelwork, equipment and excavation geometry change.

Inspection and manual checks

Provide visual context, reference measurements and a way to investigate unexpected readings.

Configured remote acquisition

Provides a time series at the agreed interval. Review data gaps, backhaul availability and alarm handling as part of the plan.

Plan the deployment

Start with the instrument schedule

Bring the construction sequence and monitoring objectives to the same conversation.

Neighbouring assets

Baseline building tilt, existing cracks, road levels and sensitive utilities before work begins.

Retaining walls

Specify the required depth profile and reference points for each excavation stage.

Struts and anchors

Link instrument locations to the temporary works design and support sequence.

Dewatering

Define well levels, pressure locations and the relationship to pumping changes.

Station boxes

Plan access and communications around adjacent live infrastructure.

Rising structures

Review loading stages, sensor protection and access as floors and cores progress.

01

Define the measurement

Share the site layout, construction sequence, instrument schedule, outputs, reading intervals and engineering response criteria.

02

Design and commission

Confirm node compatibility, radio coverage, local cable protection, gateway power and backhaul. Check installation, calibration and baseline readings.

03

Review and adapt

Agree who reviews data and responds to alerts. Reassess the network and instrument plan when excavation stages or access arrangements change.

Common questions

Before you specify a system

Can we reuse existing instruments?

Potentially. Confirm the exact output, excitation, supply voltage, channel requirements and acquisition timing. The sensor category alone does not establish compatibility.

Does wireless mean there are no sensor cables?

No. Many instruments use a cable to a nearby acquisition node. Beam Mesh carries readings by radio between nodes and the gateway; local wiring still needs protection and inspection.

Can a tiltmeter measure settlement or wall displacement?

A tiltmeter measures angular change. Use the appropriate displacement, settlement or survey method for linear movement, with engineering interpretation where measurements are combined.

Can the same system acquire piling vibration?

Validate the full acquisition chain first: sensor bandwidth, sample rate, triggering, synchronisation, storage and data transfer. Do not assume a node configured for periodic geotechnical readings captures dynamic vibration.

How does the setup change as excavation progresses?

Review sensor protection, node positions, alternative radio paths, gateway power and backhaul at each stage. Update reading intervals and the review workflow where the monitoring plan requires it.

Are Beam Mesh and TM-L LoRa interchangeable?

No. They use different communication arrangements. Specify the appropriate network and gateway for each product; TM-L LoRa should not be treated as a Beam Mesh relay.

Does monitoring replace inspections or engineering assessment?

No. Readings support the project’s inspection and response plan. The responsible engineers set thresholds, interpret trends and decide actions; monitoring does not guarantee safe loads or prevent structural failure.

Instrument monitoring at the Neste refinery excavation

Want To Know More About How Ackcio Beam Can Be Used to Wirelessly Monitor Buildings and Excavations?

Request Demo